Week 18

8/02/2026

February update was submitted.

9/02/2026

I had another meeting with my supervisor to update him on the current progress. I explained that the temperature control system, pump system, ultrasonic sensor, and servo feeder have all been tested individually and are functioning correctly.

I also informed him that I reviewed and adjusted my schedule. Some work packages were originally given more time than needed, while others required additional testing time. Therefore, I redistributed the remaining time more efficiently, focusing on system integration and physical mounting.

He was satisfied with the progress made so far and encouraged me to proceed with integration and final assembly.

10/02/2026

While reconnecting the pH sensor, I made a wiring mistake, and the sensor stopped responding. It is likely damaged and will need to be replaced. 